Glenmore Line Relocation Project
Glenmore Line Relocation Project
PROJECT SNAPSHOT
Project Name | Glenmore Line Relocation Project
Owner | ENMAX
Client’s Name | ENMAX
Location | Calgary, AB
Date / Project Timeline / Delivery | August 16, 2021 - October 17, 2021 - Scope completed
Market Sector | Utilities
BACKGROUND (Pre-Project Commencement)
Enmax required underground work to install new manholes and duct bank and remove old manholes as part of re-design work near the intersection of Glenmore and 100 St SE Calgary. Iconic and its contractors worked in coordination with Enmax and Enmax contractors.
ACTION (ICONIC’s Scope & Delivery)
- Install 4 x manholes (T105) complete with grounding
- Trench approximately 430m and install duct bank
- Install secondary pedestal
RESULT/SOLUTION
Scope completed without incident to client specifications.
Meadowlark & Poundmaker Substations
Meadowlark & Poundmaker
PROJECT SNAPSHOT
Project Name | Meadowlark & Poundmaker
Owner | EPCOR
Client’s Name | EPCOR
Location | Edmonton, AB
Date / Project Timeline / Delivery | March 1, 2021 - November 25, 2021 - All construction work executed as per EPCOR schedule.
Market Sector | Utilities
BACKGROUND (Pre-Project Commencement)
As part of the WETUP (West Edmonton Transmission Upgrade Project), the Poundmaker and Meadowlark substations are being upgraded. The transmission line between the two substations is also being upgraded.
ACTION (ICONIC’s Scope & Delivery)
Meadowlark
- Excavate to develop expansion area of substation; supply and install geotextile, insulating gravel.
- Install screw pile concrete pad foundations.
- Construct 72kV gantry; install bus support steel. Install pre-cast fence and all permanent fencing.
Poundmaker
- Excavate to develop expansion area of substation; supply and install geotextile and ground grid, insulating gravel.
- Procure, delivery and install structural steel for 240kV disconnect switch, rigid bus support, and CVT support; 72kV bus support, disconnect switch, and CVT; A-frame.
- Install all permanent fencing.
RESULT / SOLUTION
All construction work executed as per EPCOR schedule.