Glenmore Line Relocation Project

Glenmore Line Relocation Project

PROJECT SNAPSHOT

Project Name |  Glenmore Line Relocation Project

Owner | ENMAX

Client’s Name | ENMAX

Location | Calgary, AB

Date / Project Timeline / Delivery | August 16, 2021 - October 17, 2021 - Scope completed

Market Sector | Utilities

BACKGROUND (Pre-Project Commencement)

Enmax required underground work to install new manholes and duct bank and remove old manholes as part of re-design work near the intersection of Glenmore and 100 St SE Calgary. Iconic and its contractors worked in coordination with Enmax and Enmax contractors.

ACTION (ICONIC’s Scope & Delivery)

  • Install 4 x manholes (T105) complete with grounding
  • Trench approximately 430m and install duct bank
  • Install secondary pedestal

RESULT/SOLUTION

Scope completed without incident to client specifications.


Meadowlark & Poundmaker Substations

Meadowlark & Poundmaker

PROJECT SNAPSHOT

Project Name |  Meadowlark & Poundmaker

Owner | EPCOR

Client’s Name | EPCOR

Location | Edmonton, AB

Date / Project Timeline / Delivery | March 1, 2021 - November 25, 2021 - All construction work executed as per EPCOR schedule.

Market Sector | Utilities

BACKGROUND (Pre-Project Commencement)

As part of the WETUP (West Edmonton Transmission Upgrade Project), the Poundmaker and Meadowlark substations are being upgraded. The transmission line between the two substations is also being upgraded.

ACTION (ICONIC’s Scope & Delivery)

Meadowlark

  • Excavate to develop expansion area of substation; supply and install geotextile, insulating gravel.
  • Install screw pile concrete pad foundations.
  • Construct 72kV gantry; install bus support steel. Install pre-cast fence and all permanent fencing.

Poundmaker

  • Excavate to develop expansion area of substation; supply and install geotextile and ground grid, insulating gravel.
  • Procure, delivery and install structural steel for 240kV disconnect switch, rigid bus support, and CVT support; 72kV bus support, disconnect switch, and CVT; A-frame.
  • Install all permanent fencing.

RESULT / SOLUTION

All construction work executed as per EPCOR schedule.