AML 199s East Airdrie Switches and Insulators
AML 199s East Airdrie Switches and Insulators
PROJECT SNAPSHOT
Project Name | AML 199s East Airdrie Switches and Insulators
Owner | ALTALINK
Client’s Name | ALTALINK
Location | Airdrie, AB
Date / Project Timeline / Delivery | Phase 1: Feb. to April 2022, Phase 2: Sept. to Dec. 2022
Market Sector | Utilities
BACKGROUND (Pre-Project Commencement)
- Capital Replacement & Upgrades Project – 199s East Airdrie
- BROWNFIELD CONSTRUCTION, TRANSFORMER REPLACEMENT, SCADA, site preparation, equipment installation, grounding, cabling, protection and control
ACTION (ICONIC’s Scope & Delivery)
- The project involved the removal and replacement of one transformer (138kV/26.5kV, 25/33/42MVA) and pad, 138kV air break switches and strain insulators, 25kV disconnect switches and bus work, and removal of concrete pads. The project also included the installation of a Spill-Chek above grade oil containment for the transformer.
RESULT / SOLUTION
- The major outages and work was completed on time with scopes relating to delayed material delivery and deficiency work completed later.
AML Carseland Transformer Upgrade
AML Carseland Transformer Upgrade
PROJECT SNAPSHOT
Project Name | AML Carseland Transformer Upgrade
Owner | ALTALINK
Client’s Name | ALTALINK
Location | Carseland, AB
Date / Project Timeline / Delivery | Phase 1: July 2021 - Oct. 2021, Phase 2: Aug. 2022 - Nov. 2022
Market Sector | Utilities
BACKGROUND (Pre-Project Commencement)
- Capital Replacement & Upgrades Project – 525s Carseland – SCADA Equipment Upgrade
- BROWNFIELD CONSTRUCTION, TRANSFORMER REPLACEMENTS, SCADA, site preparation, equipment installation, grounding, cabling, protection and control
ACTION (ICONIC’s Scope & Delivery)
- The project involved the removal and replacement of two transformers (one 138/26.5 KV, 15/20/25 MVA, one 138/13.8 KV, 25/33/42 MVA) and pads, 25kV circuit breakers, 138kV strain insulators, 25kV bus work, Station Service Transformer, and NGR, and removal of 13.8kV & 25kV voltage regulators, and concrete pads.
- In addition, the project included installation of a firewall between the transformers, Sorbweb oil containment for each transformer, and the relocation of a transformer from an existing substation to Carseland.
RESULT / SOLUTION
- The major outages and work was completed on time with deficiency work completed later.
JUT Program
JUT Program
PROJECT SNAPSHOT
Project Name | JUT Program
Owner | ENMAX
Client’s Name | ENMAX
Location | Calgary, AB
Date / Project Timeline / Delivery | 2022 - Ongoing
Market Sector | Utilities
BACKGROUND (Pre-Project Commencement)
- ICONIC is contracted to perform Construction, Project Management, and Quality Assurance on Calgary downtown fibre network as part of the agreement between ENMAX and Telecom companies.
- ICONIC is required to work closely with ENMAX’s Engineering and Project Management team to execute over 159 on projects for various telecom companies.
ACTION (ICONIC’s Scope & Delivery)
- ICONIC is tasked with thoroughly understanding and handling multiple projects, scheduling, traffic coordination, execution, training, and quality assurance, and as-built delivery with each project.
- Ensuring ducts can be used by performing Proof and Roping for various locations downtown.
- Performing Cable Placements as required by various clients and continuous updating of as built drawings for ENMAX.
- Performing cable salvage on cable no longer required.
- Additionally ICONIC has been authorized to perform QUE (Qualified Utility Electrical) Standby for contractors.
RESULT / SOLUTION
- In working closely with our partners at ENMAX we have safely executed over 100 projects with effective communication and meeting all client’s expectations on each project.
- Meeting strict estimating, execution, quality assurance, and as-built schedule while ensuring safety is paramount with monthly reporting including behaviour-based observations (BBO) and good catches.