AML 113L Reclamation (Phase 2)

AML 112L Reclamation (Phase 2)

PROJECT SNAPSHOT

Project Name |  AML 112L Reclamation (Phase 2)

Owner | AltaLink

Client’s Name | AltaLink

Location | Canmore, AB

Date / Project Timeline / Delivery | May 22, 2023 - June 30, 2023

Market Sector | Utilities

BACKGROUND (Pre-Project Commencement)

Iconic Power Systems Inc. (IPS) completed (phase 2) reclamation work in Canmore, AB for AltaLink’s 113L transmission line rebuild project.

ACTION (ICONIC’s Scope & Delivery)

IPS’s Scope of Work for various structures had different requirements.

  • Bird sweeps
  • Recontouring structure base
  • Spreading topsoil and debris piles in structure workspace/ROW
  • Harrow/seed disturbed areas
  • Clean up burn site, spread ash and woody debris, harrow and seed
  • Located within quarry. Significant dirt-work along access trail cut/fill west of the workspace. Replace soil and recontour banks; hydroseed. Assessed for additional ESC requirements during reclamation.
  • Poles located west of structure need to be removed and disposed of.
  • Salvage gravel spread in laydown yard and redistributed on permanent access trail

RESULT / SOLUTION

  • Scope was completed on time and on budget without incident, to client specifications. Low ground impact equipment was utilized to protect the ground impact.