AML 112L RECLAMATION (PHASE 2)
PROJECT SNAPSHOT
Project Name | AML 112L Reclamation (Phase 2)
Owner | AltaLink
Client’s Name | AltaLink
Location | Canmore, AB
Date / Project Timeline / Delivery | May 22, 2023 - June 30, 2023
Market Sector | Utilities
BACKGROUND (PRE-PROJECT COMMENCEMENT)
Iconic Power Systems Inc. (IPS) completed (phase 2) reclamation work in Canmore, AB for AltaLink’s 113L transmission line rebuild project.
ACTION (ICONIC’S SCOPE & DELIVERY)
IPS’s Scope of Work for various structures had different requirements.
- Bird sweeps
- Recontouring structure base
- Spreading topsoil and debris piles in structure workspace/ROW
- Harrow/seed disturbed areas
- Clean up burn site, spread ash and woody debris, harrow and seed
- Located within quarry. Significant dirt-work along access trail cut/fill west of the workspace. Replace soil and recontour banks; hydroseed. Assessed for additional ESC requirements during reclamation.
- Poles located west of structure need to be removed and disposed of.
- Salvage gravel spread in laydown yard and redistributed on permanent access trail
RESULT / SOLUTION
- Scope was completed on time and on budget without incident, to client specifications. Low ground impact equipment was utilized to protect the ground impact.