Project Name | eReserve 4 & 6 Battery Energy Storage System
Owner | Enfinite
Client’s Name | Tetric Power
Location | Hardisty, AB
Date / Project Timeline / Delivery | September 2023 to January 2024
Market Sector | Battery Energy Storage
ICONIC supported the installation of a Battery Energy Storage System (BESS) near Hardisty, Alberta, designed to deliver 40 MW of energy storage capacity to the Alberta grid. The project featured 22 Tesla Megapack 2XL units and included a comprehensive range of civil and electrical work, from site preparation, foundations, trenching and conduit installation to grounding, cabling, terminations and overhead connections. ICONIC also provided commissioning support, helping bring the large-scale energy storage facility through the final stages of installation and integration.
ICONIC delivered a comprehensive civil and electrical scope to support the installation of the 40 MW Battery Energy Storage System. Civil work included pad and access road construction, helical screw pile foundations, trenching, and conduit supply and installation.
The electrical scope included:
Through the delivery of the supporting civil and electrical infrastructure and commissioning support, ICONIC helped bring the energy storage facility into operation, providing the infrastructure required to store and deliver power to the grid. The project represents an important addition to Alberta’s evolving energy infrastructure and demonstrates ICONIC’s capabilities in supporting large-scale battery energy storage projects.