Project Name |  AltaLink Joss MPC WAGF
            Owner | AltaLink
            Client’s Name | AltaLink
            Location | Jenner, AB
            Date / Project Timeline / Delivery | September 2021 - December 2022
            Market Sector | Utilities
           
          
          
            BACKGROUND (PRE-PROJECT COMMENCEMENT)
The project scope includes the engineering, procurement, construction, and commissioning of the following:
- Expansion of the existing substation (site development)
 
- Extension of the existing 240 kV bus with a partial diameter
 
- New A-Frame
 
- Add one new 240 kV circuit breaker
 
- The project is considered a brownfield
 
ACTION (ICONIC’S SCOPE & DELIVERY)
The scope of work consists of the following:
- Site expansion
 
- Screw pile foundations
 
- Placement and assembly of breakers, switches and associated equipment
 
- Grounding work, including grounding of offloading equipment
 
- Hydrovac Daylighting trenches for control cables
 
- Arranging site security to avoid theft, intrusions, vandalism, etc.
 
- Procuring temporary site facilities
 
- Project consisted of 1 outage to connect the new 240kv bus to the existing 240kv bus. During this outage the line drops from the new transmission line were completed by Iconic
 
RESULT / SOLUTION
Project completed in 2022.