Enfinite - eReserve 3
PROJECT SNAPSHOT
Project Name | Enfinite - eReserve 3
Owner | ENFINITE
Client’s Name | Teric Power (designed/managed on behalf of Enfinite)
Location | Grande Prairie, Alberta, Canada
Date / Project Timeline / Delivery | May 2022 - September 2022
Market Sector | Battery Energy Storage
BACKGROUND (Pre-Project Commencement)
Iconic Power Systems Inc. (Iconic) built a Tesla MegaPack Storage Facility identical to E-Reserve 1 & 2, with the exception of layout.
The 20MW facility, located in the Grande Prairie area, features 14 Tesla Megapacks and was constructed by Iconic crews over four months.
Iconic successfully energized eReserve 3 with our partners at Enfinite and Teric Power. This marks the third successfully energized BESS by the Iconic, Enfinite and Teric Power team members
ACTION (ICONIC’s Scope & Delivery)
- Site Civil Pad Construction, including laydown and access
- Supplied all materials including structural steel skids, with the exception of major equipment
- Full Time security was engaged once civil activities were completed
- Foundations
- Installation of Fence
- Installation of Trenching and Underground Conduits
- Supplied and Installed all cables and termination kits
- Construction of Control building in Iconic yard. Iconic installed switchgear and supplied and installed all LV items.
- Shipped transformers, building and misc. equipment.
- Tesla MegaPacks were shipped to site and installed by Iconic.
- Placement of battery packs, transformers, and building
- Commissioning Support
- Fibre Work
RESULT / SOLUTION
This project was completed on time and on budget without any safety incidents.