Line Trap Insulator (Phase 1)

PROJECT SNAPSHOT

Project Name |  Line Trap Insulator (Phase 1)

Owner | Hydro One

Client’s Name | Hydro One

Location | Port Carling, ON

Date / Project Timeline / Delivery | August 2022 to September 2022 on time and on budget.

Market Sector | Utilities

BACKGROUND (Pre-Project Commencement)

Construction make-ready work for joint use attachments on poles to attach fiber optic cables. In Phase 1 of this project, there were 68 H1 poles that require make-ready work

ACTION (ICONIC’s Scope & Delivery)

Pole Installation:

Iconic was responsible for installing 68 new poles/frame as per HONI standards.

Transformer Installation:

Iconic installed/transferred transformers .Suspect PCB transformers were returned once removed from site to the staging area at the Bracebridge OPS Centre where HONI was responsible for testing and disposal. All non-suspect transformers were returned at the end of the project to the OPS Centre.

Guying Improvements:

Iconic installed new guying as prescribed in the design. This was done under a holdoff using coverup where required and approved rubber glove techniques.

RESULT / SOLUTION

Project was completed on time and on budget without any safety incidents.