Project Name | Riverview Substation POD
Owner |
Client’s Name | EPCOR
Location | Edmonton, AB
Date / Project Timeline / Delivery | January 2019 to January 2020, completed on-time and on-budget.
Market Sector | Utilities
Riverview is a greenfield 240/25kV substation in the City of Edmonton’s Riverview district. ICONIC was the Prime Contractor for substation civil work, and was responsible for substation electrical work including structural, electrical and commissioning.
The project involved a major scope change once construction was underway. When the topsoil was removed, we encountered 1.5 meter of sub soil, which needed to be removed and replaced with engineered fill.
Majority of the scope of this project was completed in the winter months, which posed additional challenges to the earthworks team.
ICONIC was selected for our ability to provide a turnkey solution for EPCOR. They sought a Prime Contractor who could seamlessly bring together the complex deliverables. Our substation and earthworks teams worked in unison to complete all deliverables in an efficient and highly coordinated manner. ICONIC was also able to self-perform the reclamation and drainage scope of this project.
Earthworks Scope of Work:
Electrical Scope of Work:
ICONIC’s earthworks team was able to draw on our extensive experience building greenfield substations. We have encountered just about every challenge over the years, which allows us to quickly adapt when required. An example of this would be with proper soil management we were able to protect the civil materials from freezing before they were compacted. To ensure maximum efficiency, we utilized GPS equipment while moving soils. By sourcing materials from our long-term suppliers, we were able to pass preferential pricing onto the client as well.
Over the entire year on site, ICONIC had zero safety incidents. This was with as many as 16 crew members working on the project at any given time.