Project Name | Riverview Windfarm Substation
Owner |
Client’s Name | ENEL
Location | Pincher Creek, AB
Date / Project Timeline / Delivery | July 2019 to November 2019. Completed on time and on budget.
Market Sector | Renewable Energy, Wind
As part of Alberta’s Renewable Energy Program, Enel Green Power North America Inc. built two projects just outside of Pincher Creek, Alberta: a 115 MW wind farm and a 31MW wind farm.
ICONIC was contracted to design, procure, construct, and commission the River¬view Substation and the CRII expansion projects. It was a multifaceted project that provided ICONIC’s team the ability to shine. As one would expect at a site selected for wind power, frequent gusts required a professional construction and power team that could be counted on to safely execute this project in challenging conditions.
The work involved concurrent work by multiple teams on the two project sites. ICONIC’s construction and electrical crews worked in close collaboration to allow for smooth hand-offs, made possible by our high standards of quality control.
A. CRR2-EPC
This project component involved the addition of one feeder and protections to existing SWGR. The scope of work included:
B. Riverview Greenfield Facility
This new 240 Kv facility would be tapping off the AltaLink Castle Rock Ridge facility. The scope of work involved:
Both project components proceeded according to plan and schedule. Through ongoing communication and collaboration, ICONIC gave the client complete confidence that their project was being professionally managed and built to design. Project management best practices ensured our multiple teams, suppliers and contractors were working in unison.
Today, these facilities are playing a central role in helping Alberta businesses to meet the growing public demand for green generated energy. Construction was completed on-schedule, on-budget and with no safety incidents to report.