Project Name | Enfinite - eReserve 2
Owner | Enfinite
Client’s Name | Teric Power (designed/managed on behalf of Enfinite)
Location | Alberta, Canada
Date / Project Timeline / Delivery | May 2021 to October 2021 - ICONIC successfully met the October, 2021 COD target date.
Market Sector | Battery Energy Storage
Iconic Power Systems Inc. (ICONIC) was the Prime Contractor for Enfinite to construct their second large-scale battery storage project, located in Alberta, Canada. The project consists of a 20 MW BESS utilizing Tesla Megapack batteries, providing energy balancing and grid frequency regulation services that support Alberta’s ongoing growth toward sustainable energy. eReserve 2 became commercially operational as of October 2021. As of February 2022, ICONIC has been engaged for the construction planning and execution an additional 140MW capacity spread between several new BESS facilities.
The Tesla Megapack batteries will provide various operational strategies to support Alberta’s electrical grid. These applications will focus on the delivery of sustainable energy, renewable generation smoothing, system voltage and capacity support, as well as grid frequency regulation.
As ICONIC successfully executed the eReserve 1 project in 2020, the planning and execution of eReserve 2 was further improved and streamlined.
ICONIC had to return to site to complete emergency repairs on the grounding transformer as well as cable replacement. This project was also built in central Alberta in winter conditions so ICONIC worked closely with the owner and the landowner to overcome the short construction window and challenging site conditions.
Despite a few challenges, ICONIC successfully met the October 2021 COD target date.